|
发表于 2014-7-10 17:30:44
|
显示全部楼层
air conditioning central air come from
Lee named Li Yongqiang, 51 years old this year, is an Shenyang financial environment energy Limited by Share Ltd for class monitor. From the beginning of 1987, he was dealing with the boiler, stove,louboutin pas cher, furnace,air jordan, the environment-friendly biomass boiler, boiler with no he didn't understand.
more than 50 degrees Celsius in the office environment
",tiffany gioielli;swallow......",new nfl jerseys; Song Xiaobao Liao station in 2011 spring festival gala alongside Zhao Benshan sketch "blind date",air jordans for women; became popular in everyone's laughter.
winter when it is cold,custom nfl jerseys, hot water vapour can be directly sent upstairs heating. "Summer, here is the woman's box!" he said with a smile.
summer,hogan borse, water boiler heating water vapor to form, is used as heat source power lithium bromide air conditioning units,air jordan 12, LiBr conditioning cold water in the drive of water vapor, cold water and then sent to the central air conditioning unit upstairs and provide for the whole floor of the wind.
Lee introduced, regardless of summer and winter, the boiler burning. Summer for air conditioning, heating in winter wind,cheap nfl jerseys china, the whole building temperature is controlled by the function class master Li Yongqiang and the boiler.
seven thirty, Lao Li with a spade shovel with mixed with straw biomass particles in alcohol, point into the boiler, the furnace is done.
yesterday's furnace starting relatively late time, "because the weather is cool, air conditioner less. If it is the hottest days, furnace starting time should be at least 1 hours in advance. A few days to stop furnace, then the massive overhaul, ready for the winter heating." "Summer is burning boiler?" "not burning boiler, air conditioning central air come from?" he laughed.
6 pm, Lee Changed the work clothes, the water level will go to check the boiler, have a look in the boiler water is enough, the boiler water day after all the laboratory technician laboratory, water can not be hard,cheap nba jersey, or you will make the boiler scale, affect the service life of the boiler.
a few days ago, reporters into the Lao Li is located in Dong building, underground two layer "1000 Duopingmi's office", feel for the class monitor day.
reporter (left) in the financial environment and energy Limited by Share Ltd for the class monitor Li Yongqiang (right) under the leadership of the stoker,sandali hogan, experience the hard work, and together with his burning boiler. Reporter Bai Lin perturbation
Hard work:
Lee named Li Yongqiang, 51 years old this year,hogan donna, is an Shenyang financial environment energy Limited by Share Ltd for class monitor. From the beginning of 1987, he was dealing with the boiler, stove, furnace, the environment-friendly biomass boiler, boiler with no he didn't understand.
watch the Spring Festival evening in front of the television master Li a laugh say: Essays in Song Xiaobao "1000 Duopingmi's office", "pipe" more than 2000 people...... "You see, Lao Li, this Is it right? Said you?" said his family.
five forty-five in the morning, master Li Yongqiang will be rushed to the boiler room is located in Dong building underground to the day's work.
相关的主题文章:
safe passage of vehicles.
car"
to the village and other acti
yesterday morning, vice president Xu and students, Zhang section chief came to ward, for generation of Yu Nan's condition after the, and her father, consultation with the aftermath. Xu president told reporters, after the incident, they to the presence of every teacher and students to understand the situation, and by these people write written things after school, preliminary investigation conclusion, student Dai Yunan is self rope hanging. |
|