The New South Bridge Project in iron eleven Bureau
the bridge across the Zhang River, dry season water depth of more than ten meters, flood and tide over 20 meters deep. The main bridge design for the large section box girder, 6 main span are continuous box girder with variable cross section,scarpe hogan interactive, the main span of single span length of 120 meters, for the city of Fuzhou key project,cool ipad cases, is also the China Railway eleven Bureau four companies in 2012 key and difficult works.
because of the Zhang river the bridge is for the channel five, 2 km upstream blessed silver highway bridge and South Bridge, the bridge upstream and downstream of 200 meters has two drainage station,scarpe hogan uomo, after low tide close to the channel around the shore are the riprap beach, hydrological condition is complex, fast flowing indefinite,iphone cases 5, poor visibility conditions, is not conducive to navigation. The passage mainly tiding long Shi Yunsha's ship, the night the ship more, larger tonnage. Before the bridge,scarpe hogan prezzi, not started, often ships accidentally touch beach or hit the highway bridge or south bridge pier, or even lead to capsize accident occurred, resulting in casualties.
because of the risk of Zhang river channel, also has great security risks to the construction of New South Bridge,top ipad cases, extremely easy to cause safety accidents of ships collision construction of Zhanqiao, in order to ensure the construction safety of the bridge, the New South Bridge project four Department, to play at the beginning of, is positive and the local river Department, in the support the local relevant departments of the case, the project department in the platform bridge 6# pier construction set remote surveillance cameras, 24 hours for on-site monitoring and dispatching ships, records the information of passing ships, analyzes its navigation status,mulberry bags sale, avoid night sailing ships not in accordance with the waterway traffic, not whistle, sailing evasion does not comply with the collision dispute navigation rules reason,hogan online, if we can find the ship in a collision accident, provide strong support for the cause of the accident, the accident will play a key role. At the same time warning the passing ships,mulberry bag sale, navigation in strengthening lookout, drive carefully, do "very sure, seven separate, and three points against accident".
(China Railway Network correspondent Xiao Fan) construction of China Railway eleven Bureau four companies in Fujian Province, Fuzhou key municipal engineering -- New South Bridge, located in Minjiang Fuzhou city Minhou County Branch Creek Dazhang and Wulong River Interchange,hogan, the bridge a total length of 2.6 km, width 34 meters, two-way 6 lane, a total investment of 519000000 yuan.
through the above measures, to ensure the construction safety at the same time,custom iphone 4 cases, also safe navigation of ships played a key role, therefore,hogan outlet online, the New South Bridge project four Department of the company by the local ship owners and local people affectionately become God protect the river "".